Keeping existing wastewater systems running during invasive construction projects requires precise planning and significant collaboration between designers, contractors and O&M staff. Ignoring the practical realities of system operational constraints and requirements can create headaches for O&M staff, increases the potential for contractor claims and schedule delays and heightens risk of discharge permit violations. Successful projects avoid or minimize operations disruptions and carefully manage critical shutdowns.
A diverse panel of agency staff, engineers and contractors experienced in construction at operating facilities will share insights and experience from their careers. The panel will discuss best practices during both design and construction to prepare for interruptions and interface with existing facilities. Common challenges will be highlighted along with specific activities to avoid gaps and hiccups. Potential topics include:
- Early identification of process constraints
- Successful engagement of O&M staff during design
- Incorporating requirements into contract documents
- Structured processes during construction
- Communication strategies to align parties