Conference Agenda
Overview and details of the sessions of this conference. Please select a date or location to show only sessions at that day or location. Please select a single session for detailed view (with abstracts and downloads if available).
Please note that all times are shown in the time zone of the conference. The current conference time is: 24th Aug 2026, 05:31:19am America, Santiago
|
Daily Overview |
| Session | |
|
16F: Government, Industry & Academic Virtual location: VIRTUAL: Agora Meetings | |
| Presentation 3 | |
4:56pm - 5:04pm
Evaluate the availability of equipment before and after the implementation of Total Productive Maintenance at Cantol company, 2025 Universidad Tecnológica del Perú UTP - (PE), Perú The purpose of this article was to evaluate equipment availability before and after the implementation of Total Productive Maintenance (TPM) at Cantol. The identified problem was low equipment availability, caused by mechanical and electronic failures and prolonged setup times, resulting in significant operational downtime losses. Historical availability records from the pre- and post-TPM implementation phases were used for the analysis, considering the company's implemented pillars, such as preventive maintenance, autonomous maintenance, and staff training. During the pre-implementation phase, average equipment availability was 55% for the transfer machine, 55% for the pear set assembly machine, and 53% for the vibratory machine. In the post-implementation phase, these values increased to 70%, 75%, and 68%, respectively. This increase demonstrates the effectiveness of TPM by significantly contributing to the reduction of unplanned downtime and the optimization of operating time, reaffirming its viability and applicability in a peruvian metalworking company. | |
