Conference Agenda
Overview and details of the sessions of this conference. Please select a date or location to show only sessions at that day or location. Please select a single session for detailed view (with abstracts and downloads if available).
Please note that all times are shown in the time zone of the conference. The current conference time is: 24th Aug 2026, 05:30:45am America, Santiago
|
Daily Overview |
| Session | |
|
33F: Logistics & Transport Virtual location: VIRTUAL: Agora Meetings | |
| Presentation 5 | |
12:12pm - 12:20pm
Implementation of Lean Manufacturing Tools in Inventory Management at Agro Marsa S.A.C, Chimbote, 2026 Universidad Tecnológica del Perú UTP - (PE), Perú The objective of this research was to determine the impact of Lean Manufacturing tools on inventory management at Agro Marsa S.A.C. in Chimbote during 2026. The identified problems included recurrent stockouts and a critical accumulation of obsolete products. Using a quantitative approach and a longitudinal pre-experimental design, a census population of 79 products was intervened. The implementation integrated ABC classification to prioritize the catalog, 5S methodology to standardize the warehouse, and a Kanban system to regulate the technical replenishment of high-turnover products. The results showed a significant reduction in product obsolescence, dropping from 15.39% to 6.43% (a 58.2% improvement). Similarly, the service level increased from 84.06% to 95.70%. Financial analysis validated the project's feasibility with a Net Present Value (NPV) of S/ 10,938.63 and a benefit-cost ratio of 1.64, achieving investment recovery in 11.15 months. It is concluded that the transition to technical management based on Lean significantly optimizes logistical efficiency and organizational profitability. | |
